DCSIMG

New bridge to be craned into place

No Caption ABCDE

No Caption ABCDE

Boston’s new bridge is to be craned into place this afternoon (Saturday).

A crane has been built on site to lift the new St Botolph’s Bridge into place.

There had been concern that high winds could have postponed the move - but that appears to no longer be an issue.

The project has cost £750,000.

 

Comments

 
 

Back to the top of the page