Level crossing break causes traffic delays

Road closed.
Road closed.

The level crossing on the A17 at Swineshead Bridge has caused delays after being broken for an hour this afternoon (Wednesday).

A police spokesman confirmed the crossing was reported to be broken at about 2.30pm and engineers were sent out to deal with the issue.

They added that their system reported that the problem was fixed and traffic was flowing at about 3.30pm.